First, IBM RS6000 Minicomputer migration aspects. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Case 1, IBM Minicomputer hardware migration are as follows: a two SMEs IBM p650 Minicomputer, two p630 Minicom, a p670 Minicomputer from one floor to another floor of Building Information Centre, the Information Centre on achieving. |
|
|
|
|
|
|
|
|
|
|
|
|
Before the shift for the main programme are as follows: |
1), the system administrator all Minicomputer backup data. |
2) Each line corresponds to the network switch ports cable labeling. |
3) SAN connections online labeling, including each of the corresponding fiber Zone card label. |
4) FAST600 optical storage drives labeling. |
5) fiber-optic line labeling. |
6) For two P650 HACMP done by the aircraft when the main labels. |
|
|
|
|
|
|
|
|
|
|
|
|
Shift the way for the main programme are as follows: |
1) engineers carefully handling a host to a designated location. |
|
|
|
|
|
|
|
|
|
|
|
|
Shift to the destination of the main programmes, as follows: |
1) a set of engineers to install p650 machines. |
2) engineers installed SAN fabric switches. |
3) engineers installed FAST600 optical storage. |
4) Engineers in accordance with the previous zone tags and labels fiber line connecting mainframe. |
5) in accordance with the previous network engineers labels to the network switch. |
6) engineers installed p630 machines. |
7) network engineers in accordance with the label p630 previously connected to the network switch. |
8) p670 Minicomputer engineers installed, in accordance with previous labels connecting IO drawer. |
9) network engineers in accordance with the label p670 previously connected to the network switch. |
|
|
|
|
|
|
|
|
|
|
|
|
Second case, application data migration software as follows: a city banks, the original two H70 Minicomputer IBM, the HACMP Notes domino moved to the two p570 Minicomputer do HACMP. And achieve centralized information center. |
Migration is as follows: |
1) backup of the original two H70 Minicomputer domino data. |
2) the installation of a new operating system AIX5.3 two P570 Minicomputer |
3) installation of a new dual two HACMP P570 Minicomputer software. |
4) Test double HACMP software. |
5) Installation Notes domino software. |
6) Notes domino software. |
7) on the restoration of the original H70 Notes domino data to the new P570 on the disk array. |
8) test data in the Notes domino HACMP software on the dual-takeover situations. |
9) Notes domino internal testing data in HACMP software on the dual-takeover success. |
10) Notes domino internal testing data receiver connected to the Internet backbone success. |
11) Notes domino data migration success. |
|
Second, migration and data services Minicomputer the success of the case are as follows: |
|
|
|
|
|
Beijing SMEs in a two H85 + D40 + T00 HACMP +7133- Cabinets moved from one floor to another floor of an information centre, centralized management of information. Migration to pass the test successfully. |
|
|
|
|
|
Shanghai will be a bank in the original pair of two-H70 mainframe (HACMP) under the environment of Lotus Domino mail server migration to the two p570 small plane, Lotus Domino mail server environment in the two-plane (HACMP) switch to the normal data , successfully passed the test migration. |
|
Beijing, China Contact: |
1)Tel:(8610)82666745 |
2)Fax:(8610)82666745 |
3)Contact: Mr.huo |
4)Phone: 13301272832 |
5)E-mail: bjslkc@163.com |
6)Company:Beijing DeepBlue the Rongxin Technology Development Co., Ltd. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|